Wednesday - 20 August 2008
Published: 12 December 2006 04:20 PM
Source: The Engineer
Memorials having been received from the Whitechapel District Board and the St. George-in-the-East and Rotherhithe Vestries, urging the necessity for a new bridge over the Thames below London Bridge, it was resolved – ‘That, with a view to meet the great and increasing traffic, form the north-east to the south-east of London, it be referred to the engineer to report as to the most advantageous position for a bridge across the Thames below London Bridge, which would be best suited to meet the pressing requirements of the public.’…
| Bookmark with: |
| Job Title | Job Location | Job Position |
|---|---|---|
| Project Director (Construction Project... | WorldWide | Permanent |
| Principle Quantity Surveyor... | East Anglia | Permanent |
| Highways Technician... | South East | Permanent |
| Chartered Structural Engineer... | South West | Permanent |
| Structural Engineers... | South East | Permanent |
| Structural CAD Technician... | Europe | Permanent |