Saturday - 04 July 2009
Published: 03 March 2008 11:30 AM
Source: The Engineer Online
The initial KC-45A contract calls for four system design and development aircraft and is valued at $1.5bn. The first KC-45A airframe completed its first flight on September 25, 2007 and will now begin military conversion to the tanker configuration. The KC-45A's aerial refuelling boom system is currently in flight test and is said to have successfully performed numerous in-flight contacts with receiver aircraft.
The KC-45A Tanker aircraft will be assembled at new manufacturing facilities in
The KC-45A will be built by a team led by Northrop Grumman, and includes primary subcontractor EADS North America and General Electric Aviation, Sargent Fletcher, Honeywell, Parker, AAR Cargo Systems, Telephonics and Knight Aerospace.
| Bookmark with: |
| Job Title | Job Location | Job Position |
|---|---|---|
| Manufacturing Engineer... | Wales | Permanent |
| Airworthiness Engineer... | Lancashire | Permanent |
| Head Of Engineering – Threat Mitigation... | London | Permanent |
| Systems Engineer / Architect... | United Kingdom | Permanent |
| Requirements Manager... | United Kingdom | Permanent |
| Product Engineer... | South East | Permanent |
Visit us to Compare & buy Laptops, Desktops, Digital Cameras, Printers and many more at CheckCost UK.