Friday, 01 August 2014
masthead+quote+image
Advanced search

Bloodhound needs components from UK manufacturers

UK motorsport engineering companies are being invited take part in the Bloodhound land-speed record project following the launch of design and manufacture work packages.

According to a statement, approximately 3,000 bespoke components will be needed over the next 12 months to complete the jet- and rocket-powered vehicle that is being prepared for an attempt on a record speed of 1,000mph.

A list of components requiring either final design and/or manufacture can be found on the Motorsport Industry Association’s website. Click here to learn more.

Businesses can find parts indexed by specialism, such as CAD design, additive manufacture, CNC machining and composites. Other components include the 1.6m-high tail fin, 90cm wheels for UK runway testing up to 200mph and the drivers pedal box that will control the throttle for the jet engine and wheel disc brakes.

Businesses are being invited to select and quote for the work packages they are interested in undertaking. If accepted, design drawings and, where applicable, the tooling and materials, will then be provided to them.

The Bloodhound team aims to produce a rolling chassis by Christmas 2012 with UK runway tests scheduled for the second quarter of 2013. High-speed testing on the desert race track, Hakskeen Pan, South Africa, is slated for the third quarter of 2013.

The Bloodhound Education Programme now has 4,800 primary and secondary schools from across the UK signed up and using Bloodhound education resources designed to illuminate science, technology, engineering and maths (STEM) lessons.

The programme is also growing internationally with 3,666 schools from 62 countries involved.


Have your say

Mandatory
Mandatory
Mandatory
Mandatory

My saved stories (Empty)

You have no saved stories

Save this article

Digital Edition

The Engineer July Digi Issue

Poll

London Mayor Boris Johnson is lobbying for a £10 additional charge for diesel cars to drive into Central London by 2020, and for road tax on diesel cars and all pre-2006 cars to be increased, to counter air pollution. What option most closely matches your opinion on this?

Previous Poll

Europe's largest tidal array in the Pentand Firth off Orkney will eventually generate up to 86MW of power. What will it take for tidal energy to make an appreciable contribution to the UK's energy needs?

Read and comment on the results here