Advanced search

Argentina inks high-speed rail deal

Alstom and partners Iecsa, Isolux Corsan and Emepa have been awarded a contract to construct a very high-speed rail link between Buenos Aires, Rosario and Córdoba in Argentina.

Alstom’s share of the contract, which will become effective subject to the implementation of financing, is valued at around €1.1bn.

According to Alstom, the 710km journey between Buenos Aires and Córdoba currently takes 14 hours. The new line will link the Argentine cities in three hours and will be served by eight Alstom double deck very high-speed trains that are capable of carrying 509 passengers at speeds of up to 320kph.

The construction of the line will be divided into two with a line being built between Buenos Aires and Rosario, then Rosario and Córdoba. Once the basic design is validated, the construction works are scheduled to last four years.

The project involves the construction of infrastructure - including seven stations, electrification and signalling - plus the supply of rolling stock and maintenance.

Have your say

Mandatory
Mandatory
Mandatory
Mandatory

My saved stories (Empty)

You have no saved stories

Save this article

Current Issue

The Engineer 14 May 2012

Poll

Local authorities in Cumbria and Kent are discussing the possibility of deep-level nuclear waste repositories, where waste will be sealed into underground vaults for thousands of years. What are your feelings about this method of disposing of high- and intermediate-level nuclear waste?

Previous Poll

Will the government's proposed large infrastructure projects be sufficient to lift Britain out of a second recession?

Click here to see the results and comment.