Advanced search

Repowering a Welsh windfarm

ScottishPower Renewables and partner Eurus Energy are seeking to re-energise one of the UK’s oldest windfarms in Powys, mid-Wales.

ScottishPower Renewables and partner Eurus Energy, trading as CeltPower, are seeking to re-energise one of the UK’s oldest windfarms in Powys, mid-Wales, in a project that will treble the output of energy produced by the site - once the largest in Europe when it was originally built in 1992.

The proposed redevelopment of the existing Llandinam windfarm would include a significant reduction of turbines on the site from 103 to 42.

If ScottishPower is granted planning permission, the newly repowered windfarm would be capable of producing 96MW of energy – a rise from the current output of 31MW. As such, it will be capable of powering the equivalent of over 53,000 households.

Plans are also being made to 'recycle' the old turbines by offering them to developers of renewable energy projects elsewhere in the UK and eastern Europe.

CeltPower will be hosting a number of public information days in Llandinam and the surrounding areas during May to outline details of the proposed development.

Earlier this year, the Eurus Energy Group completed one of the largest wind farms in Japan, the Noheji Wind Farm at Noheji-machi, Kamikita-gun, Aomori Prefecture. The wind farm has a total output capacity of 50MW.

Have your say

Mandatory
Mandatory
Mandatory
Mandatory

My saved stories (Empty)

You have no saved stories

Save this article

Current Issue

The Engineer 14 May 2012

Poll

Local authorities in Cumbria and Kent are discussing the possibility of deep-level nuclear waste repositories, where waste will be sealed into underground vaults for thousands of years. What are your feelings about this method of disposing of high- and intermediate-level nuclear waste?

Previous Poll

Will the government's proposed large infrastructure projects be sufficient to lift Britain out of a second recession?

Click here to see the results and comment.