ENERPAC
Enerpac was granted the contract to perform the stage lifting and lowering of the Beijing Olympics stadium roof as part of the construction process. The entire configuration including the central computer, satellite computer controllers, 156 double-acting, high-pressure hydraulic cylinders and 55 electronically controlled hydraulic power units was specified and custom designed by Enerpac
For more information on this company click here
To add your company click here
Massive new Coventry campus targets 60GWh battery output
Where will all the raw materials come from for the manufacturing process? How will they be transported to the factory and what is going to be done with the various scrap and residues?