Contract double nets Technip Offshore £45 million

Technip-Coflexip announced today that its UK entity, Technip Offshore UK, has won contracts from Ramco Energy and BG International valued in excess of £45 million.

Technip-Coflexip announced today that its UK entity, Technip Offshore UK, has won contracts valued in excess of £45 million.

Ramco Energy awarded the first EPIC (Engineering, Procurement, Installation and Commissioning) contract, valued in excess of £35 million, for their Seven Heads development in the North Celtic Sea Basin, southwest Ireland.

As part of the pipelines and subsea infrastructure contract, Technip Offshore UK will undertake the project management; engineering and design, manufacture and installation of all five in-field flowlines required to tieback six wells to a central manifold.

The second EPIC contract, awarded by BG Group and valued at £10 million, is for Technip Offshore UK to perform subsea installation at the BG operated-Blake Flank development in the Outer Moray Firth.

The contract includes the tie-back of two subsea production wells and one water injection well to the existing Blake Production Manifold.

Technip Offshore UK will undertake the project management, engineering and design, manufacture and installation of three flexible flowlines and two electro-hydraulic control umbilicals.

Fabrication of the flexible flowlines will be undertaken at Technip-Coflexip’s Le Trait manufacturing facility, in France, and the umbilicals manufactured under a separate contract by Technip-Coflexip subsidiary, DUCO in Newcastle, England.