Stora Enso awards Metso recovery boiler contract

Metso and Stora Enso have signed an agreement on the single-drum conversion of Stora Enso’s Imatra Mills’ recovery boiler.

The conversion of the recovery boiler will be completed in the fall of 2012.

The upper and lower drum of the recovery boiler and the steam-generating bank between them will be replaced by a new drum and separate boiler bank elements needed for heat recovery.

At the same time, the second stage of the economiser will be rebuilt.