Foster Wheeler set to provide HRSGs for Mexican power plant

A subsidiary of Foster Wheeler’s Global Power Group has been awarded a contract by SCS Proyectos for the design and supply of two heat recovery steam generators (HRSGs) to be installed in a cogeneration power plant for the Tereftalatos Mexicanos project in Mexico.

The terms of the agreement have not been disclosed and the contract value is included in the company’s second-quarter 2012 bookings.

Foster Wheeler will design, supply and provide advisory services for the erection and start-up of the two HRSGs, which will be coupled to two LM 6000PF combustion turbines.

Delivery of the HRSGs is scheduled for mid-2013.