Hima-Sella wins Total E&P UK gas terminal safety contracts

Hima-Sella has begun work on three contracts to provide protection against overpressure scenarios at the Total E&P UK gas terminal at St Fergus, Scotland.

Wood Group PSN appointed the systems integration specialist to upgrade an existing overpressure protection system, while valve manufacturer Mokveld selected the company to provide and install a high-integrity pressure protection system and interlock overpressure protection system.

Hima-Sella is also providing a SIL3-rated HIMA HIMatrix system as a controller for sequence-of-events reporting and pressure transmitter discrepancy calculations.

Commissioning is scheduled for mid to late September.