Product Details Supplier Info More products

Aker Solutions has signed a contract valued at approximately NOK2.3bn (GBP235m) with Eni Norge to deliver a subsea production system to the operator’s Goliat field development in the Barents Sea.

The scope of work comprises the engineering, procurement and construction (EPC) of a complete subsea production system.

Subsea hardware deliveries include eight overtrawlable four-slot subsea templates with manifolds, 24 subsea trees, subsea control systems, 20km of steel tube umbilicals, work-over equipment and a tie-in and connection system.

Aker Solutions will utilise large parts of its Norwegian manufacturing network to deliver the subsea equipment to Goliat.

Subsea trees will be manufactured at Aker Solutions’ facility at Tranby, steel tube umbilicals will be constructed in Moss and templates and manifolds will come from the company’s Egersund yard.

Subsea control systems will be manufactured in Aberdeen.

The project will be managed from Aker Solutions’ head office at Fornebu, Norway.

Deliveries of the subsea equipment will start in 2011 and run through 2013.

The Goliat oil-and-gas field is located in the Barents Sea, approximately 85km north west of Hammerfest.

Aker Solutions Oil and Gas

View full profile