Product Details Supplier Info More products
Download document:

‘Carbon infrared heaters browning ready meals’ - .PDF file.

When Geest installed a new food production line at its Milton Keynes factory, it needed to ensure that the technology for browning toppings matched the technology of the rest of the new line. Geest contacted Bedford-based Protech Food Systems. A complete oven system was designed and installed, incorporating carbon infrared heater modules, exhaust modules and the relevant control system from Heraeus Noblelight.

Click on the link above to download the case study.

Case study: carbon infrared heaters from Heraeus help to brown meals for Geest

When Geest installed a new food production line at its Milton Keynes factory, it needed to ensure that the technology for browning toppings matched the technology of the rest of the new line. Geest contacted Bedford-based Protech Food Systems. A complete oven system was designed and installed, incorporating carbon infrared heater modules, exhaust modules and the relevant control system from Heraeus Noblelight.

Click on the link above to download the case study.

View full profile