Product Details Supplier Info More products
Download document:

‘Infrared heat saves energy and space curing powder coating’ - .PDF file.

By installing an infrared oven from Heraeus Noblelight, Klinger UK has been able to achieve significant savings in energy costs in the curing of powder coatings on a range of sealing gaskets at its Bradford manufacturing plant. In addition, the infrared system occupies less than half the space required by the previous gas-fired convection oven and has allowed component throughput to be considerably increased.

Click on the link above to download the case study.

Case study: infrared heat saves energy and space in the curing of powder coatings

By installing an infrared oven from Heraeus Noblelight, Klinger UK has been able to achieve significant savings in energy costs in the curing of powder coatings on a range of sealing gaskets at its Bradford manufacturing plant. In addition, the infrared system occupies less than half the space required by the previous gas-fired convection oven and has allowed component throughput to be considerably increased.

Click on the link above to download the case study.

View full profile