Bridge over the River Cam

It physically divides the deck in two to providing a cycleway rising on the highpoint and a pedestrian route that levels out. The pedestrian path is formed in lightweight perforated aluminium planks supported on cantilevered steel arms, while the cycleway is a resin-bonded gravel surface on a structural steel box deck.
With a total bridge length of 200m, the design includes two rest pods situated along the parkside Chesterton ramp, which connects to the access ramp and provides information and seating.
The main materials used in the construction of the bridge were selected for durability and low maintenance and are recyclable.
Cambridgeshire County Council project manager Mike Davies said: ‘We really believe that the striking modern design of the bridge gets the right balance of respecting the existing surroundings whilst providing a high quality, innovative and attractive structure.’
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of premium content. Register for free to unlock unlimited access to all of our premium content, as well as the latest technology news, industry opinion and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
BEAS funding available to help businesses cut energy costs
And not a moment too soon, if the following exchange broadcast last Friday 13th June, on the Radio 4 ´Rare Earth´ program (link below, ~ 17 minutes...