Wiping the slate clean: careers in nuclear waste management
The UK faces major challenges in dealing with nuclear waste, which means an abundance of opportunity in the industry
Last month, a £6.1bn deal to clean up the UK’s redundant fleet of Magnox nuclear reactors was pulled after the government mishandled how the work was awarded. Dr Paul Dorfman, University College London’s nuclear power expert, believed it was “inevitable” the deal would fail. He claimed the challenges of decommissioning nuclear plant and dealing with their waste have long been underestimated.
This has proven to be an expensive mistake. Taxpayers must now pay almost £100m in compensation to companies who bid for Magnox work in the UK but failed to get it. The main problem, according to Dr Dorfman, is nuclear power plants were built in a rush in the 1950s with little thought given to how they might be decommissioned. Each Magnox reactor is unique so taking each one apart has its own very specific challenges.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of premium content. Register for free to unlock unlimited access to all of our premium content, as well as the latest technology news, industry opinion and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Experts speculate over cause of Iberian power outages
I´m sure politicians will be thumping tables and demanding answers - while Professor Bell, as reported above, says ´wait for detailed professional...