Aircraft Carrier Alliance awards sub-contracts
The alliance responsible for delivering the UK’s Queen Elizabeth Class aircraft carriers is awarding four more sub-contracts worth almost £33.2m.

A total of around £1.5bn worth of sub-contracts have been awarded by the Aircraft Carrier Alliance (ACA), which includes Babcock, BAE Systems, Thales UK and the Ministry of Defence, for building the new range of Royal Navy aircraft carriers known as the Queen Elizabeth Class.
Once fully built the 65,000 tonne carriers will be three times the size and double the width of existing ships with a range of 8,000 to 10,000 nautical miles. Once in service the new class of ship will be capable of holding 40 aircraft.
Each ship will rely on six main electrical generators that together can generate 80MW of power.
The first carrier, the HMS Queen Elizabeth, is due to enter service in 2016.
Seven UK suppliers have recently been awarded contracts for providing a number of vital services and parts for the ships, including the massive storage facility near Glasgow where components and equipment for the ships will be securely stored prior to being fitted on to the aircraft carriers.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Experts speculate over cause of Iberian power outages
I´m sure politicians will be thumping tables and demanding answers - while Professor Bell, as reported above, says ´wait for detailed professional...