Italian power heads

Bombardier Transportation has received an order from Trenitalia for the upgrade of 60 ETR 500 electric power-heads in a deal worth approximately $43 million.

Bombardier Transportation has received an order from Trenitalia (Italian Railways) for the upgrade of 60 ETR 500 electric power-heads in a deal worth approximately $43 million (€35 million).

The upgrade consists of modifying 60 power-heads, which were produced in 1992 by the consortium Trevi (of which Bombardier is also a member). The modification will enable the power-heads, which are currently adapted to operate solely on high-speed lines, to operate on the conventional network when coupled with standard intercity coaches.

Moreover, the power-heads will receive a new on-board signalling system as well as electrical and mechanical modifications to enable the coupling with the standard coaches. This upgrade will enable Trenitalia to couple a set of two power-heads to a maximum of 14 standard coaches, thereby creating 30 new intercity trains, ready to travel at top speeds of about 200 Km/h.

Bombardier will be responsible for the project design and engineering, material and equipment supply for all power-heads and supervision and commissioning of the first two power-heads. The production works will be carried out by Trenitalia at its Foligno facilities.

Register now to continue reading

Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.  

Benefits of registering

  • In-depth insights and coverage of key emerging trends

  • Unrestricted access to special reports throughout the year

  • Daily technology news delivered straight to your inbox