New Teesside plant to build giant GE wind blades
GE Renewable Energy is building a new manufacturing facility in Teesside that will supply giant blades for the wind turbines of Dogger Bank.
Due to open in 2023, the plant will be operated by GE subsidiary LM Wind Power and will employ up to 750 people directly, with an additional 1,500 jobs being supported indirectly across the region. The factory will manufacture 107m long blades for GE’s Haliade-X, claimed to be the world’s most powerful offshore wind turbine, with a single rotation generating enough energy to power a UK home for two days.
Sea mussels to inspire offshore wind farm solutions
An engineer’s view: over 40 years in offshore wind and infrastructure
“This new plant will contribute to the development of an industrial cluster dedicated to offshore wind in the North East of England,” said Jerôme Pécresse, president and CEO of GE Renewable Energy.
“We are delighted to announce such a commitment for the renewable energy industry, we believe it will help develop a strong talent pool through the hiring and more importantly training of future colleagues. The UK’s target to commission 40GW of offshore wind by 2030 is ambitious and requires that we invest in local production capabilities to accompany this effort.”
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Experts speculate over cause of Iberian power outages
I´m sure politicians will be thumping tables and demanding answers - while Professor Bell, as reported above, says ´wait for detailed professional...