Newcastle geothermal energy project nears final phase

A pioneering project to drill deep under the heart of Newcastle in search of geothermal energy is about to enter its final phase.

This week sees the arrival of the ‘Big Rig’, a hydraulic hoist rig standing 16m tall and capable of lifting 100 metric tonnes.

The new drill — which is made of a thermo-stable polycrystalline diamond and is being supplied by specialist NOV Downhole — will bore as far as 2,000m underground as part of a major research project being led by Newcastle University.

Drilling deep under the planned 24-acre Science Central site — the site of the former Scottish and Newcastle Brewery — the university team hopes to eventually find water that is at a temperature of around 80oC.

Since the £1,050,000 project was launched three months ago, UK-wide drilling specialist Drilcorp has opened up the first 250m, taking the borehole down past the old mine workings of the former North Elswick Colliery.

Now, European onshore drilling expert Geometric Drilling is picking up the baton and drilling down the remaining 1,750m.

Register now to continue reading

Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.  

Benefits of registering

  • In-depth insights and coverage of key emerging trends

  • Unrestricted access to special reports throughout the year

  • Daily technology news delivered straight to your inbox