Swiss train order for Bombardier

Bombardier Transportation has announced that it has signed a contract valued at €138m with Swiss Federal Railways to supply 140 low-floor passenger coaches.

has announced that it has signed a contract valued at €138m with

(SBB) to supply 140 low-floor passenger coaches.

The contract includes an option for an additional 48 vehicles, raising the potential order volume to a total of about €181m. Deliveries of the coaches are scheduled to begin in July 2008 and end in July 2012.

SBB intends to use the new air-conditioned low-floor coaches to replace the previous intermediate cars in its existing fleet of regional trains.

Bombardier's sites in Zurich and Villeneuve, Switzerland are responsible for developing the passenger vehicles. Assembly, commissioning and delivery of the vehicles will be carried out at the Villeneuve plant. The carbodies will be manufactured in Dunakeszi, Hungary, and the bogies will be sourced from Siegen, Germany.

Register now to continue reading

Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.  

Benefits of registering

  • In-depth insights and coverage of key emerging trends

  • Unrestricted access to special reports throughout the year

  • Daily technology news delivered straight to your inbox