This week in 1941: Failure of the Tacoma Narrows Bridge

Dramatic film footage showing the collapse of the Tacoma Narrows bridge, known as Galloping Gertie, provided an object lesson in how not to design a bridge. An article in The Engineer analysed the report into the collapse.

The 5,000ft-long, two-lane suspension bridge was the third longest of its kind in the world. It was also the first suspension bridge of its type to use plate girders, rather than open lattice beam trusses, to support the roadbed.

This meant that with the new design, wind could not pass through the truss but was diverted above and below the structure, leading the bridge to sway and buckle in winds.

This motion was not thought to threaten the bridge's structural integrity but, four months later, 40mph winds caused it to twist and eventually collapse into the river.

The Engineer

wrote that despite being 'well designed and built to resist safely all static forces usually considered in the design of similar structures,' the bridge was simply unable to withstand the 'excessive oscillations'.

Register now to continue reading

Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.  

Benefits of registering

  • In-depth insights and coverage of key emerging trends

  • Unrestricted access to special reports throughout the year

  • Daily technology news delivered straight to your inbox