Wind power expansion
GE Energy plans to invest over $100m to expand manufacturing operations in Europe and launch its 2.5xl wind turbine.

GE Energy plans to invest over $100m (£57m) to expand manufacturing operations in
The company’s wind turbine manufacturing facility in
According to the European Wind Energy Association,
Victor Abate, vice president-renewables for GE Energy, said: ‘As GE’s European Renewable Energy Center of Excellence, the Salzbergen site is the base for the serial production of the 2.5xl wind turbine - a high reliability machine specifically designed to meet the immediate requirements of Europe, where the lack of available land can constrain the size of projects.’
The 2.5xl wind turbine is said to be GE’s most advanced turbine for efficiency and meets the latest stability and availability standards of European distribution networks.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Experts speculate over cause of Iberian power outages
I´m sure politicians will be thumping tables and demanding answers - while Professor Bell, as reported above, says ´wait for detailed professional...