Testing the water

The first software programme to analyse the power generated by the wave and tidal industry is being developed by UK energy consultancy TNEI.
The team at TNEI is creating the model for its Interactive Power Systems Analysis (IPSA) software program so that it can analyse wave and tidal farms in a way that will help shape their development and design.
The IPSA program has already been used to analyse wind farms. This was the first time that software systems were used for the renewable energy form in the UK.
The wave and tidal software is being developed in tandem with the growth of the industry, which is currently in its relative infancy. TNEI hopes that, when the software model is completed at the end of 2009, it will be an essential tool in helping the industry to develop and mature.
IPSA software specialists are developing generic wave and tidal models for the program, which will work with real data to provide accurate predictions of the power that wave and tidal energy devices can provide. It is hoped that this will help with the design and development of the electrical network and grid connections for wave and tidal farms.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Experts speculate over cause of Iberian power outages
I´m sure politicians will be thumping tables and demanding answers - while Professor Bell, as reported above, says ´wait for detailed professional...