Doppelmayr Italia has placed an order with Siemens’ Industry Solutions (IS) division for electrical equipment for a Cable Liner Shuttle in
The fully automatic, cable-hauled public rapid transit system will run along an 830m-shuttle line between the artificial
Two trains, each with a capacity of 200 people, will commute between the stations at a speed of just under 30kph.
Siemens’ Innsbruck,
The final customer of the shuttle is a Venetian company called Azienda Servizi Mobilità, and operation of the shuttle is scheduled to start in 2009.
Nanogenerator consumes CO2 to generate electricity
Nice to see my my views being backed up by no less a figure than Sabine Hossenfelder https://youtu.be/QoJzs4fA4fo