ABB equipment for hydropower plant
ABB has won a $120m order from Kraftwerke Linth-Limmern (KLL) to supply electrical equipment for a new hydropower plant and energy storage facility in eastern Switzerland.

ABB has won a $120m (£73m) order from Kraftwerke Linth-Limmern (KLL) to supply electrical equipment for a new hydropower plant and energy storage facility in eastern Switzerland.
The Linth-Limmern pumped-storage hydropower station will be installed in an underground cavern in the Linthal valley. The facility will be used to pump water from the lower reservoir (the Limmernsee) in the valley to the upper reservoir (the Muttsee), 600m above the station. During peak demand, water will be released from the upper reservoir to generate power.
The project will help to meet future demand across Switzerland and the first of four generating units is expected to be operational by 2015.
ABB will provide electrical equipment, including transformers, medium-voltage switchgears and instrumentation and automation systems. It will also provide a 380kV gas-insulated switchgear (GIS) substation, which will help to feed power from the plant into the grid.
Pumped-storage facilities offer the most effective opportunity for large-scale energy storage in terms of both cost and environmental impact. The ability to tap into stored reserves during periods of higher demand improves the reliability of power supplies.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Comment: The UK is closer to deindustrialisation than reindustrialisation
"..have been years in the making" and are embedded in the actors - thus making it difficult for UK industry to move on and develop and apply...